A CWBP and HD Plug can be pumped down together and set in the drill hole in one operation. The procedure is to insert the CWBP into the head rod and pump the CWBP down some 20 meters or more into the rod string then insert the HD Plug into the head rod then follow the normal procedure for setting the CWBP. Once the CWBP is set, raise the rods a further 400mm and set the HD Plug as per instructions. HD Plugs may be drilled out if required.
Note: The above method of pumping the two down together cannot be used with the CWBP - The CWBP and HD Plug must be set separately.
Construction
Drillable aluminium, steel and urethane. Also available in non spark materials as illustrated in black. Material Data Safety Sheets (MSDS) available upon request.
Van Ruth® plugs & packers technical specifications
View or download these technical product specifications
You might also be interested in: